This is where the new siding will begin.
Where does starter strip go on a roof.
Align this side close to the lowest part of the roof.
There are a few general best practices you need to know.
After you put the starter strip on cover completely with flashing.
Following the manufacturer s directions.
At the eave the starters provide a simple way to cover the joints between the finish shingles in the first course ensuring complete water shedding roof coverage.
Owens corning starter strip shingle helps save time by eliminating the need to cut shingles to create a starter row.
Vinyl siding starter strips.
Historically starter strip shingles have been used not only at the lower eave edge of the roof but experienced professionals also use them at the gable or rake edges of roofs.
Ideally starter shingles used should be specially made to be used as starter.
This should leave you with about 1 2 of the shingle left.
Spread a thick coating off a good roof adhesive on the flashing and then start your shingles starting in the middle go all the way to the other side and then back again.
Yes and use elmers school glue on the edges.
The end should overhang over the edge about 1 4 to 3 4 of an inch.
This chalk line should be level and a consistent distance from the eaves or the top and bottom of the windows.
To begin installing the first shingles on your roof cut off the three tabs on the shingle.
I like to use a 10 common nail to insure the shingles stay down with.
Before peeling the shingle starter strip trim about 4 inches off an end of the first starter strip and align the strip to the area you are planning to stick it on.
Step flashing is the most time consuming of all flashing jobs on the roof because you must complete it step by step as you shingle up the roof.
Use approx 23 nails for every 1 1 2 ft.
You will want the roof granular side up when applying the strip.
These starter shingles will have a tar strip on the bottom to help hold the edges of the roof down and prevent blow offs.
The continuous sealant ensures an effective seal between the starter and the first course of shingles.
Typically manufacturers design starter strip shingles with a perforated line splitting them horizontally so that they can be easily separated and used with smaller shingles if necessary.
Snap a level chalk line for the first starter strip at the base of the wall no less than 8 inches above ground level after determining the lowest corner of the house.
It is packaged two pieces per shingle 16 shingles per bundle.